Energy and Renewable Energy

Electrical Contracting

Manage electrical applications with work schedule, site coordination and acceptance criteria.

01 /

From need to right architecture

Manage electrical applications with work schedule, site coordination and acceptance criteria. Rethink energy use, from production to consumption, with a focus on efficiency and sustainability. Scope; It is determined by evaluating existing systems, business priorities and operational constraints. Product selection and application details are clarified according to this evaluation.

02 /

Service scope

The following topics are evaluated in the Electrical Contracting study. Final deliverables are included in the bid after discovery and analysis.

  • 01Field coordination
  • 02material planning
  • 03Assembly inspection
  • 04As-built documents
03 /

technical approach

Field coordination forms the initial input. Material planning and Assembly inspection are evaluated together; The operability of the application is supported with as-built documents.

  • 01Load profile and site evaluation
  • 02Protection coordination and measurement
  • 03Monitoring and performance analysis
04 /

Application process

Consumption data, site conditions and connection requirements are evaluated. Technical feasibility and alternative scenarios are prepared. After the applicability and necessary permits are clarified, the engineering and installation phase begins. Measurements, commissioning checks and maintenance plan are delivered together.

05 /

Areas of use

It can be evaluated for new facilities and comprehensive renovation works. Existing architecture, data sensitivity, physical conditions, and the organization's operational resources determine the limits of the application.

06 /

Expected benefits and validation

Target; To clarify decisions through field coordination and to strengthen operational control through assembly inspection. Acceptance criterion: completion of the application file with measurement reports and current drawings. Benefits and durations are not guaranteed without discovery.

Frequently asked questions

01What is needed to start Electrical Contracting work?+

The current situation, new facility and comprehensive renovation work requirements, and the targeted result should be shared. In the first evaluation, the necessary data and responsibilities for field coordination are determined.

02How are scope and delivery criteria determined?+

Completion of the application file with measurement reports and current drawings. Scope, dependencies, excluded work and support conditions are clarified in writing in the proposal and implementation plan.

YOUR NEXT STEP

future togetherLet's shape it.

Let’s discuss your needs and design a technology journey that creates value for your business.

Contact Us